Customer stories / Transformer / Failure risk

    Transformer windings ran 30% hot while the air around them cooled

    All three transformer winding temperatures on one wind turbine rose 30.0% above the expected value. Ambient and nacelle air were cooling at the same time, and the flag's risk was low. At the annual maintenance, the site team found the transformer fan faulty and replaced its contactor.

    Wind50MWhavoided-loss potential
    +29.5%
    above comparable turbines
    +22.7%
    stable deviation since 4 October
    −18.3%
    ambient temperature, last 14 days
    9 days
    from flag to fix

    Kavaken flagged the transformer winding temperatures of one wind turbine: all three phases were 30.0% above the expected value and 29.5% above comparable turbines at the same wind farm. The risk was rated low, and the drift had built up over several weeks. Ambient temperature had fallen 18.3% over the same period, so the windings should have been cooling. Kavaken pointed to the transformer cooling fan or its ventilation path as the most likely cause. Nine days after the flag, at the annual maintenance, the site team found the transformer fan faulty and replaced the fan contactor.

    The weather cooled, the windings did not

    Over the 14 days before the flag, the inputs that usually drive transformer temperature pointed the other way.

    Ambient temperature
    −18.3%
    Average ambient temperature fell from 20.1 °C to 16.4 °C. Nacelle air temperature fell 4.5%.
    Winding temperatures
    +30.0%
    All three phase windings rose together to 30.0% above the expected value on the flag date.

    Output power and rotor speed ran in different operating regimes over the same period, with output power up 13.6% and rotor speed down 8.2% against the 30 days before. None of these model inputs explained the above-expected winding temperatures. All three phases rose at once while the air around the transformer cooled, which pointed to the cooling rather than to the load.

    Chart comparing the last 14 days with the 30 days before: ambient temperature down 18.3%, nacelle air down 4.5%, output power up 13.6%, rotor speed down 8.2%, with a note that these inputs do not explain the winding temperatures.
    Figure 1. Over the 14 days before the flag, ambient temperature fell 18.3% and nacelle air temperature 4.5%. These model inputs did not explain the above-expected winding temperatures.

    9 days from flag to fix

    SignalKavakenSite team

    1. Day −24 · 18 Sep 2026 · Signal

      Winding temperatures start to drift up

      The deviation of the transformer winding temperatures from comparable turbines began rising from an average of 0.3%, following a fluctuating trend.

    2. Day −8 · 4 Oct 2026 · Signal

      Deviation settles at a new level

      The deviation from comparable turbines stabilised at 22.7% and stayed there.

    3. Day 0 · 12 Oct 2026 · Kavaken

      Kavaken flags transformer overheating

      Phase 1–3 winding temperatures were 30.0% above the expected value and 29.5% above comparable turbines, with a low risk level and an upward trend. Kavaken pointed to the cooling fan or ventilation path. It recommended measuring the fan cut-in sequence, fan current and contactor operation, cleaning the ventilation grilles and air ducts, and verifying the winding temperature protection inputs.

      Flag log, Kavaken (translated): Insufficient performance of the transformer cooling fan or ventilation path is the most likely cause of the simultaneous high-temperature divergence across all three phase windings, which has continued despite decreasing ambient temperatures.

    4. Day 9 · 21 Oct 2026 · Site team · Fix

      Faulty fan found, contactor replaced

      During checks at the annual maintenance, the site team found the transformer fan faulty. They replaced the faulty fan contactor with a new one.

      Flag log, site team (translated): During the checks at the annual maintenance on 21.10.2026, the transformer fan was found to be faulty. The faulty contactor was replaced with a new one.

      Close-up of a fan contactor in an electrical cabinet, outlined in red and marked as faulty, with a label showing it was replaced on 21 October 2026.
      Figure 2. The faulty transformer fan contactor, replaced by the site team on 21 October 2026.
    5. Day 9 · 21 Oct 2026 · Site team

      Flag resolved

      The site team closed the flag and recorded the contactor replacement as the action taken.

      Flag log, site team (translated): Transformer fan contactor replaced.

    Why it stayed hidden

    0.3%
    deviation when the drift began
    Low
    risk level on the flag date
    −18.3%
    ambient temperature over the same period

    The drift began from a 0.3% deviation and built up over several weeks with a fluctuating trend, so no single day stood out. All three phases rose together, so comparing one phase with another showed nothing unusual. Ambient and nacelle air were cooling at the same time, and the risk was still rated low on the flag date. The problem only showed when the windings were compared with what the conditions predicted and with comparable turbines at the same wind farm.

    The outcome

    The site team confirmed the cause on site: the transformer fan was faulty, and they replaced the fan contactor on 21 October 2026, Day 9 after the flag. This matches the cause Kavaken pointed to, the transformer cooling fan circuit. The flag was resolved the same day.

    The client rated Kavaken's role in the resolution as key.

    Production
    50 MWh
    Financial
    USD 3,300
    CO2
    30 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    When all three transformer windings drift up together while ambient air cools, check the cooling fan circuit first, including its contactor. A low-risk flag with a steady deviation can still be a failed fan.

    Next caseA climb made on a low-risk flag found a bearing that needed cleaningRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.