Customer stories / Transformer / Failure risk

    Transformer winding heat rose as load fell; new fans and fuse ended it

    Two transformer winding temperatures jumped to 47.0% above expected while output power was falling. The first SCADA overtemperature warning came two days after the Kavaken flag. The site team replaced the transformer fans and their 35 A fuse, and the signals returned to normal.

    Wind180MWhavoided-loss potential
    +47.0%
    winding temperature above expected
    +38.3%
    above comparable turbines
    −20.6%
    output power over 14 days
    6 days
    from flag to fan replacement

    On 15 October 2026 Kavaken flagged a wind turbine whose transformer winding phase 2 and 3 temperatures had risen to 47.0% above the expected value and 38.3% above comparable turbines at the wind farm. The risk was rated low, and load and ambient temperature were both falling, so nothing on site demanded action yet. Kavaken pointed to the transformer ventilation and fan circuit as the leading cause. Two days later the first SCADA overtemperature warning appeared, with a power limitation. On 21 October the site team replaced the transformer fans and the 35 A fuse that feeds them. By 6 November the signals were back to normal and the flag was resolved.

    Line chart over 14 days of actual versus expected transformer winding temperature. Actual stays near expected until 10 October, then climbs above the model band to 107.4 °C on 15 October.
    Figure 1. On the flag day the transformer winding phase 2 and 3 temperatures read 107.4 °C against an expected 57.1 °C, 47.0% above the model value, after a step up from 13 October.

    Less load, more heat

    Over the 14 days before the flag, the turbine's operating conditions and its transformer winding temperatures moved in opposite directions.

    Output power
    −20.6%
    Average output power fell from 2,184 kW to 1,735 kW. Generator speed fell 17.7%, nacelle air temperature 8.5% and ambient temperature 10.3%.
    Winding phase 2 and 3 temperature
    +47.0%
    On the flag day the windings read 107.4 °C against an expected 57.1 °C.

    The expected value already accounts for load and temperature. With all of these inputs falling, operating or environmental conditions could not explain the rise. The deviation was specific to this turbine and appeared on both phases at once, which pointed to the transformer's cooling rather than to the windings themselves.

    Bar comparison of four operating inputs, recent 14 days versus the 30 days before: output power down 20.6%, generator speed down 17.7%, nacelle air temperature down 8.5%, ambient temperature down 10.3%.
    Figure 2. Over the last 14 days, output power, generator speed, nacelle air temperature and ambient temperature all fell, while the winding temperature deviation grew.

    22 days, step by step

    SignalKavakenSite team

    1. Day −2 · 13 Oct 2026 · Signal

      Winding temperatures step up suddenly

      The deviation of the phase 2 and 3 winding temperatures from the expected value jumped from an average of 0.0% to 36.9%. The deviation from comparable turbines jumped from 0.6% to 34.1%. The new level held.

    2. Day 0 · 15 Oct 2026 · Kavaken

      Kavaken flags transformer winding overheating

      Kavaken flagged the windings at 47.0% above expected and 38.3% above comparable turbines, while load and ambient temperature were falling. It named insufficient performance of the transformer ventilation and fan circuit as the leading cause. It recommended verifying the cooling method, measuring fan supply, operating current and airflow, cleaning the air passages and measuring the contact resistance of the phase connections.

      Horizontal bar chart of transformer winding temperature per turbine at the farm. The flagged turbine is highlighted at 107.4 °C, well above the dashed average line at 52.1 °C.
      Figure 3. On the flag day the flagged turbine's winding temperature of 107.4 °C was the highest at the farm, 38.30% above the 52.1 °C average of same-model turbines.
    3. Day 2 · 17 Oct 2026 · Signal

      First SCADA overtemperature warning appears

      SCADA raised a transformer overtemperature warning that lasted about 4.5 hours. A power limitation due to high temperature followed, lasting 2.59 hours, with an estimated 1,937.8 kWh of lost production.

    4. Day 5 · 20 Oct 2026 · Site team

      Site team plans the work

      The site team planned the intervention for 21 October.

    5. Day 6 · 21 Oct 2026 · Site team · Fix

      Transformer fans and fan fuse replaced

      The site team replaced the transformer fans and the 35 A fuse that supplies them. This matched the fan circuit Kavaken had pointed to.

      Flag log, site team (translated): The transformer fans and the 35 A fuse for the fans were replaced.

    6. Day 9 · 24 Oct 2026 · Kavaken

      Kavaken links the warning to the flag

      Kavaken recorded the 17 October warning as an event related to the flag and asked for the date and details of the intervention. The site team confirmed the fan and fuse replacement.

      Flag log, Kavaken (translated): The anomaly in the flag appears to have started showing up on site as a SCADA warning. If an intervention was planned, please enter its date; if it was done, its date and details.

    7. Day 22 · 6 Nov 2026 · Site team

      Signals back to normal, flag resolved

      The winding temperature signals had returned to normal and the intervention was judged successful. The flag stayed open briefly so the observation-period records could be reviewed together, and was resolved the same day.

    Why it stayed hidden

    −20.6%
    output power while winding temperatures rose
    2 days
    from the flag to the first SCADA warning

    Lower load and cooler air should have brought winding temperatures down. Instead they rose. A check that looks only at absolute readings against fixed limits sees nothing until a limit is crossed. Here that happened on 17 October, two days after the flag, when SCADA raised the first overtemperature warning and limited power. Kavaken compared the windings with what the model expected for the actual load and temperature, and with comparable turbines at the same farm. That made the deviation visible from 13 October.

    The outcome

    After the transformer fans and their 35 A fuse were replaced on 21 October, the phase 2 and 3 winding temperatures came back to normal. The winding temperature returned to within the expected band, and on 6 November the intervention was judged successful and the flag was resolved.

    The fix came after one SCADA overtemperature warning and a 2.59-hour power limitation on 17 October. It came before the problem could grow further.

    The client rated Kavaken's role in the resolution as key.

    Time series from September to late November of transformer winding phase 2 temperature with a green expected band. A sharp spike above the band at the flag line, then readings back inside the band.
    Figure 4. Transformer winding phase 2 temperature peaked above 100 °C around the flag and returned to within the expected band after the fans and fuse were replaced on 21 October.
    Production
    180 MWh
    Financial
    USD 12,000
    CO2
    110 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    When a transformer runs hotter while load and ambient temperature fall, check the cooling fans and their supply before a limit trips. Comparing against expected values and comparable turbines shows the drift before SCADA does.

    Next caseA broken flap actuator wire behind a transformer heat pattern seen beforeRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.