Customer stories / Main shaft bearing / Failure risk

    Main bearing flagged about 18 months before the CMS raised a ticket

    The main shaft bearing temperature of a wind turbine began to drift in April 2024. In January 2025 there was still no CMS or SCADA warning, so nothing forced action. A lubrication change had a visible but temporary effect, and a main bearing replacement in August 2026 brought the signals back to normal.

    Wind40MWhavoided-loss potential
    50 °C
    SCADA warning set value
    8
    SCADA high-temperature warnings, Jul–Aug 2026
    2
    interventions on the bearing
    ~1 month
    of normal signals after replacement

    In early April 2024, Kavaken flagged anomalous behavior in the main shaft bearing heat characteristics of a client's wind turbine. The anomaly was on a rising trend. In January 2025 there was still no CMS or SCADA warning. A SCADA temperature warning came by May 2025. A CMS ticket came only in October 2025, about 18 months after the flag. The site team extended the lubrication interval in May 2025. The effect showed in the signals but did not stop the trend. The main bearing was replaced on 23 August 2026, and the signals stayed normal afterwards.

    Kavaken and the CMS, on the same bearing

    Two systems watched the same main shaft bearing. They raised the issue at very different times.

    Kavaken flag
    Apr 2024
    Anomaly in the main bearing temperatures, already on a rising trend.
    CMS ticket
    Oct 2025
    A CMS ticket was in place, and a bearing replacement was under consideration.

    Between the two, in January 2025, there was no CMS or SCADA warning. Kavaken had already raised the risk level and recommended a check of the main bearing lubrication systems.

    Line chart of main shaft bearing temperature from April 2024 to late 2026 with red markers at summer peaks near 50–55 °C, next to a scatter plot of bearing temperature against nacelle air temperature.
    Figure 1. Main shaft bearing temperature (rotor end) from 45 days before the flag, with red markers on peak periods, and plotted against the nacelle air temperature over 1042 paired days.

    From the first flag to the bearing replacement, step by step

    KavakenSite teamSignal

    1. Day 0 · 5 Apr 2024 · Kavaken

      Main bearing temperature anomaly flagged

      Kavaken detected anomalous behavior in the main shaft bearing heat characteristics. When the flag was opened on 21 May 2024, the anomaly was still on a rising trend.

      Flag log, Kavaken (translated): From early April 2024, an anomaly related to the main bearing temperatures began to show. It is still on a rising trend.

    2. Day 285 · 15 Jan 2025 · Kavaken

      Risk level raised, still no warning

      The anomaly on the DTR RotBearTemp 1 sensor increased, and Kavaken raised the risk to level 2. On 16 January there was no CMS or SCADA warning.

      Flag log, Kavaken (translated): Currently there is no CMS or SCADA warning.

    3. Day 313 · 12 Feb 2025 · Kavaken

      Lubrication system check recommended

      The trend was still upward. Kavaken recommended checking the main bearing lubrication systems, together with another turbine. The site team started investigating on 20 February.

    4. Day 398 · 8 May 2025 · Site team · Fix 1 of 2

      Lubrication interval extended after SCADA warning

      After a SCADA temperature warning with a set value of 50 °C, the site team changed a lubrication parameter and extended the lubrication interval.

      Flag log, site team (translated): After the temperature warning on SCADA (warning set value: 50 degrees), the lubrication parameter was changed on 08/05/2025 and the lubrication interval was extended.

    5. Day 447 · 26 Jun 2025 · Kavaken

      Anomaly back on a rising trend

      On 22 May the effects of the intervention were visible in the signals, and the turbine was moved to monitoring. By 26 June the anomaly was rising again. Kavaken recommended evaluating it together with another turbine on site that showed a similar trend.

    6. Day 566 · 23 Oct 2025 · Signal

      CMS ticket in place

      A CMS ticket was in place for the bearing, and a replacement was under consideration.

    7. Day 678 · 12 Feb 2026 · Signal

      Stop on high rotor bearing temperature

      The turbine stopped on a high rotor bearing temperature stop (ROTB Temp H Stop).

    8. Day 821 to 867 · 5 Jul – 20 Aug 2026 · Signal

      Repeated warnings, then stops and limitation

      The turbine had long stops caused by blade damage. When it restarted, the bearing temperature anomaly continued where it had left off. Eight DTR RotBearTemp 1 H Warn warnings followed between 5 July and 14 August, the longest lasting 100.1 hours. By 20 August, Kavaken saw a performance drop, stops and limitation caused by the main bearing.

      Flag log, Kavaken (translated): When the turbine was restarted, the main bearing temperature anomaly continued where it had left off.

      Event table listing eight SCADA warning rows for a rotor bearing high-temperature warning in July and August 2026, with durations from 7.7 to 100.1 hours and 0 kWh loss.
      Figure 2. Eight DTR RotBearTemp 1 high-temperature SCADA warnings between 5 July and 14 August 2026, the longest lasting 100.1 hours, each with 0 kWh recorded loss.
    9. Day 870 · 23 Aug 2026 · Site team · Fix 2 of 2

      Main bearing replaced

      The main bearing was replaced.

      Flag log, site team (translated): 23/08 main bearing replacement.

    10. Day 910 · 2 Oct 2026 · Kavaken

      Values normal after replacement, flag resolved

      On 17 September, Kavaken saw that the signals had been normal for close to a month after the replacement. The flag was resolved on 2 October, with values normal after the replacement.

    Why it stayed hidden

    0
    CMS or SCADA warnings in January 2025
    50 °C
    SCADA warning set value
    Oct 2025
    CMS ticket in place

    The issue was a change in how the bearing heats up, not a single high reading. The SCADA warning trips at a fixed 50 °C. A slow drift stays below that limit for months, especially in cooler weather. Kavaken compares the main shaft bearing temperature with inputs such as the nacelle air temperature, so the drift showed from April 2024. In January 2025 neither CMS nor SCADA had raised anything. The first SCADA temperature warning came by May 2025, and the CMS ticket in October 2025.

    The outcome

    The main bearing was replaced on 23 August 2026. By 17 September the signals had been normal for close to a month. On 2 October the values were still normal after the replacement, and the flag was resolved.

    The earlier lubrication change of May 2025 showed in the signals, but the anomaly was on a rising trend again by June 2025. Before the replacement, the bearing caused a stop in February 2026, repeated SCADA warnings in July and August 2026, and a performance drop with stops and limitation.

    The client rated Kavaken's role in the resolution as key.

    Production
    40 MWh
    Financial
    USD 3,000
    CO2
    20 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    A slow rise in main bearing temperature can stay under fixed SCADA and CMS limits for months. Track it against conditions such as the nacelle air temperature, and plan the inspection and parts before warnings, stops and limitation arrive.

    Next caseA hot gearbox bearing traced to a broken circulation pump couplingRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.