Kavaken flagged anomalous heat behaviour in a wind turbine's gearbox rotor-end bearing on 12 May 2025. Its low-speed shaft bearing temperature was clearly diverging from similar turbines on the site. The turbine raised no warning for another 90 days, and its first high-temperature warnings caused only short power limitations. The client forwarded the Kavaken flag to the OEM and followed it up. In January 2026 high-temperature stops began. On 12 January a broken intermediate coupling on the circulation pump was replaced. By mid-February the anomaly symptoms had disappeared.

What was suspected, and what was found
Kavaken recommended checking the gearbox lubrication thermo bypass system and the bearings during a period without wind.
The coupling was replaced on 12 January 2026. In the weeks after, the bearing temperature anomaly faded.
281 days, step by step
KavakenSignalSite team
- Day 0 · 12 May 2025 · Kavaken
Kavaken flags rotor-end bearing heat
Kavaken detected anomalous heat behaviour in the gearbox rotor-end bearing, with an upward trend. When the flag was opened to the client on 26 June, the low-speed shaft bearing temperature was clearly separating from similar turbines on the site. On 1 July the site team said it would check.
Flag log, Kavaken (translated): The divergence of the gearbox LSS bearing temperature from similar turbines on the site can be clearly seen.
- Day 90 · 10 Aug 2025 · Signal
First SCADA bearing temperature warning
On Day 90 the turbine raised its first GBX BearTemp 2(Rot) H Warn, lasting 9.7 h. The next day a power limitation followed, lasting 0.1 h and costing 5.7 kWh.
- Day 129 · 18 Sep 2025 · Kavaken
Risk level raised as anomaly grows
On 24 July Kavaken noted that the anomaly trend was continuing and that the divergence from the site had started around 13 April. By 18 September the GBX BearTemp 2(Rot) sensor models showed the anomaly progressing, and Kavaken raised the flag to risk level 2.
- Day 206 to 231 · 4 Dec – 29 Dec 2025 · Signal
Oil filter warnings join bearing warnings
From 4 December, GBX OilFilt Warn(75% clogged) appeared and recurred through the month. The longest lasted 101.3 h. Bearing temperature warnings and short power limitations continued alongside it.

Figure 2. December 2025 events: GBX OilFilt Warn(75% clogged) recurring, the longest for 101.3 h, next to bearing temperature warnings and short power limitations. - Day 240 · 7 Jan 2026 · Kavaken
Kavaken recommends checking the thermo bypass
Bearing temperature warnings had been running for days, one of them for 70.4 h from 2 January. Kavaken recommended checking the gearbox lubrication thermo bypass system and the bearings during a windless period.
Flag log, Kavaken (translated): Checking the gearbox lubrication thermo bypass system and the bearings during a windless period is recommended.

Figure 3. Warnings and limitations on 6–9 January 2026: GBX BearTemp 2(Rot) H Warn running for 27.5 h and 22.6 h, with power limitations of 5 to 28 minutes. - Day 241 · 8 Jan 2026 · Site team
Site team plans the check
The site team suspected a blocked thermo bypass valve. They planned maintenance for the first windless spell.
- Day 242 to 243 · 9 Jan – 10 Jan 2026 · Signal
High-temperature stops begin
Four GBX BearTemp 2(Rot) H Stop events stopped the turbine on 9 and 10 January. The longest lasted 6.1 h and the largest single loss was about 14,470 kWh. In total, the related events add up to 13.7 h of stop time.

Figure 4. Stops on 9–11 January 2026: four GBX BearTemp 2(Rot) H Stop events, the longest 6.1 h. The full table totals 13.7 h of stop time and 36,228 kWh of stop loss. - Day 245 · 12 Jan 2026 · Site team · Fix
Broken pump coupling found and replaced
The intermediate coupling of the circulation pump was found broken, so the pump could not circulate the water. The coupling was replaced on 12 January, and the flag moved to an observation period.
Flag log, site team (translated): The intermediate coupling of the circulation pump was broken. It was found that for this reason it could not circulate the water.
- Day 277 · 13 Feb 2026 · Kavaken
Anomaly symptoms have disappeared
After a month of observation, Kavaken saw that the anomaly symptoms had disappeared. It judged the intervention successful.
- Day 281 · 17 Feb 2026 · Site team
Flag resolved
The problem was solved after the client's team forwarded the Kavaken flag to the OEM and followed it up. The flag was resolved on Day 281.
Flag log, site team (translated): Action was taken following Kavaken's warnings. The flag is resolved.
Why it stayed hidden
The bearing temperature stayed below the turbine's warning limit for 90 days after Kavaken flagged its divergence from similar turbines. When warnings did come, the power limitations they triggered were short: the first one lasted 0.1 h and cost 5.7 kWh. Not one of the related events stopped the turbine in 2025. Nothing in the alarm list forced a stop until the high-temperature stops of 9 January 2026.
The outcome
Kavaken kept the flag under observation after the coupling was replaced on 12 January 2026. By 13 February the anomaly symptoms in the bearing temperature had disappeared, and Kavaken judged the intervention successful.
The client's team noted that the problem was solved after they forwarded the Kavaken flag to the OEM and followed it up. On 17 February they closed the flag, noting that action had been taken following Kavaken's warnings. The client rated Kavaken's role in the resolution as key.
- Production
- 290 MWh
- Financial
- USD 22,200
- CO2
- 180 t
Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.
Takeaway
A gearbox bearing temperature that drifts away from similar turbines can come from the cooling path, not only from the bearing. Check the circulation pump and its coupling along with the thermo bypass system, before the SCADA limits start stopping the turbine.