    Generator segment temperatures stepped up and stayed 33.0% above the expected value. Output was stable, the weather was getting cooler and no SCADA warning was raised. The OEM replaced the generator fan motor, and the deviation disappeared.

    Wind360MWhavoided-loss potential
    +33.0%
    above the expected value
    37.5%
    average deviation after the step, up from 1.9%
    11 days
    from flag to fan motor replacement
    24 days
    without the deviation after the repair

    Kavaken flagged a high-risk overheating pattern in a wind turbine's generator windings. All six generator segment temperatures and their average had stepped up and stayed high: 33.0% above the expected value and 40.5% above similar turbines at the farm. Output power was stable, and nacelle and ambient temperatures were falling. Nothing in the operating conditions explained the heat, and no SCADA warning was raised. Kavaken pointed to inadequate generator cooling or heat transfer as the most likely hypothesis. Eleven days after the flag, the OEM replaced the generator fan motor. The deviation then disappeared, and similar turbines stayed normal.

    Two charts. Left: generator average segment temperature over time, with the step-up, the flag, the repair and the return to the expected band marked. Right: temperature against output power, with the fault period about 30 °C above normal.
    Figure 1. Generator average segment temperature stepped up in late September and stayed above the expected band until the generator fan motor was replaced on 8 October. It then returned to the band.

    Hotter generator, cooler surroundings

    Over the 14 days before the flag, compared with the preceding 30 days, the generator and its surroundings moved in opposite directions.

    Generator segment temperatures
    +33.0%
    above the expected group average on the flag date, and 40.5% above similar turbines at the farm.
    Ambient temperature
    −28.0%
    lower, while nacelle air temperature fell 16.0% and output power stayed stable.

    Operational or environmental heating could not explain the rise. After the step, the generator cooler inlet temperature fell 21.2% and the outlet temperature fell 29.6%. Kavaken noted that a flow measurement was needed to assess this change in terms of heat transfer.

    36 days, step by step

    SignalKavakenOEMSite team

    1. Day −6 · 21 Sep 2026 · Signal

      Segment temperatures step up and stay

      The average deviation from the expected value across all generator segment sensors jumped from 1.9% to 37.5%. The deviation from similar turbines jumped from 6.3% to 44.3%. The new levels were sustained.

    2. Day 0 · 27 Sep 2026 · Kavaken

      Kavaken flags generator winding overheating

      Kavaken raised a high-risk flag on generator segment temperatures 1–6 and their average. The most likely hypothesis was inadequate generator cooling or heat transfer. Kavaken recommended reviewing the alarm logs, measuring liquid circuit flow and cooler heat transfer, checking temperatures with independent measurements and assessing operation against the manufacturer's limits.

      Bar chart of one-day average generator segment temperature per turbine of the same model. The flagged turbine is at 99.3 °C. The others are between 54.8 and 62.1 °C, with an average of 58.7 °C.
      Figure 2. On the flag date the turbine's generator segment temperatures averaged 99.3 °C, against 58.7 °C for similar turbines at the farm: 40.5% higher and the highest reading.
    3. Day 11 · 8 Oct 2026 · OEM · Fix

      OEM replaces the generator fan motor

      The OEM team replaced the generator fan motor on the turbine.

      Flag log, site team (translated): On 08.10.2026 the generator fan motor on the turbine was replaced by the OEM.

    4. Day 36 · 2 Nov 2026 · Kavaken

      Kavaken confirms the deviation has gone

      The deviation had stayed at the level of the flag until 8 October and then disappeared abruptly. It had not been seen for 24 days, and similar turbines were normal. Kavaken asked the site team for the intervention details.

      Flag log, Kavaken (translated): The deviation stayed at the level at which the flag was opened until 08.10.2026, then disappeared abruptly after that date and has not been seen for 24 days. The deviation is also normal on similar turbines.

    5. Day 36 · 2 Nov 2026 · Site team

      Site team confirms the fault was cleared

      The site team confirmed that the fault was cleared by the OEM team on 8 October, and the flag was resolved.

      Flag log, site team (translated): On 08.10.2026 the fault was cleared by the OEM team.

    Why it stayed hidden

    No warning
    from SCADA when the flag was raised
    −16.0%
    nacelle air temperature
    −28.0%
    ambient temperature

    The turbine kept producing normally, with stable output power, and no SCADA warning was raised. The weather was getting cooler, and the generator cooler inlet and outlet temperatures fell after the step. A check of the cooling circuit temperatures alone would not have pointed to a problem. The issue became visible only when the segment temperatures were compared with their expected values under the same conditions and with similar turbines at the farm.

    The outcome

    The fix was confirmed in the monitored data. The deviation disappeared after the generator fan motor was replaced on 8 October. It had not returned 24 days later, and similar turbines stayed normal. The Kavaken chart shows the average segment temperature back in the expected band, with a peak of 75 °C since the repair.

    The client rated Kavaken's role in the resolution as key.

    Production
    360 MWh
    Financial
    USD 23,900
    CO2
    230 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    A step change in winding temperatures while output is stable and the weather is cooling points to the cooling path, not the load. Compare segment temperatures with similar turbines, and check the generator fan and cooling flow before the winding insulation pays for it.

    Next caseGenerator overheating flagged six weeks before SCADA reactedRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.