Customer stories / Generator windings / Failure risk

    Generator overheating flagged six weeks before SCADA reacted

    Kavaken flagged a rising generator cooling air temperature on 24 May 2025. The site first linked it to hot weather and long production hours, and SCADA raised nothing until 5 July. The cause was a drop in generator cooling fan performance, and the fan was replaced.

    Wind50MWhavoided-loss potential
    42 days
    flag to first SCADA warning
    2.8 h
    power limitation on 5 July
    ~1,075 kWh
    estimated limitation loss
    Day 86
    cooling fan identified as cause

    On 24 May 2025 Kavaken flagged anomalous heat behavior in a wind turbine's generator windings, developing with a rise in the generator cooling air temperature. No alarm was active. A month later the site team linked the increase to above-seasonal air temperatures and long production hours, and chose to keep watching. On 5 July SCADA reacted with cooling air overtemperature warnings, a stop and a 2.8-hour power limitation. In August the site team traced the rise to a drop in generator cooling fan performance and carried out fan replacement and maintenance. By January 2026 the anomaly had disappeared from the signals.

    Weather or equipment

    The same temperature rise had two explanations, two months apart.

    24 June 2025
    Hot weather
    The site team linked the increase to above-seasonal air temperatures and long production periods. They decided to monitor and plan maintenance if it continued.
    18 August 2025
    Cooling fan
    The site team traced the temperature increase to a drop in generator cooling fan performance. Fan replacement and maintenance followed.

    Both explanations fit a summer rise in cooling air temperature. Only the second one stopped the trend.

    227 days, step by step

    KavakenSite teamSignal

    1. Day 0 · 24 May 2025 · Kavaken

      Kavaken flags generator winding heat anomaly

      Kavaken detected anomalous behavior in the generator windings heat characteristics, with an upward trend tied to the generator cooling air temperature. The risk was rated low and no SCADA alarm was active.

      Flag log, Kavaken (translated): An anomaly developing with the rise in generator cooling air temperature was observed.

    2. Day 31 · 24 Jun 2025 · Site team

      Site links the rise to hot weather

      The site team put the increase down to above-seasonal air temperatures and long production hours. They kept the issue under investigation, with maintenance to be planned if the rise continued.

      Flag log, site team (translated): Some increase was seen due to above-seasonal air temperatures and long production periods. It is being examined; if it continues, maintenance will be planned.

    3. Day 42 · 5 Jul 2025 · Signal

      SCADA warns, stops and limits power

      Two generator cooling air overtemperature warnings came first. Later that day the same condition stopped the turbine for 3 minutes (94 kWh lost) and then triggered a power limitation of 2.8 hours, with an estimated loss of about 1,075 kWh.

      Event table with four generator cooling air overtemperature events: SCADA warnings on 5 July and 15 August 2025, a 3-minute stop with 94 kWh lost and a 2.8-hour power limitation with about 1,075 kWh lost.
      Figure 1. SCADA events for generator cooling air overtemperature: two warnings, a 3-minute stop and a 2.8-hour power limitation on 5 July 2025, and a further 9-minute warning on 15 August.
    4. Day 83 · 15 Aug 2025 · Signal

      Another cooling air overtemperature warning

      SCADA raised a further generator cooling air overtemperature warning lasting 9 minutes, with no production loss.

    5. Day 86 · 18 Aug 2025 · Site team · Fix

      Cooling fan found weak and replaced

      The site team identified a drop in generator cooling fan performance as the cause of the temperature rise. Fan replacement and maintenance were carried out.

      Flag log, site team (translated): Temperature increase due to a drop in generator cooling fan performance. Fan replacement and maintenance are being carried out.

    6. Day 227 · 6 Jan 2026 · Kavaken

      Anomaly gone from the signals

      Kavaken reviewed the signals after the interventions and confirmed that the anomaly had disappeared.

      Flag log, Kavaken (translated): After the interventions, the anomaly is seen to have disappeared from the signals.

    Why it stayed hidden

    42 days
    from the flag to the first SCADA warning
    Low
    risk rating at the time of the flag
    Hot weather
    the first explanation on site

    When Kavaken raised the flag, the cooling air temperature was rising but had not reached any SCADA limit, so no warning or stop forced a decision. The rise came in a season of above-normal air temperatures and long production hours, which gave it a plausible, harmless explanation. Only on 5 July did the temperature cross the overtemperature thresholds, and by then the turbine was stopping and limiting power.

    The outcome

    After the cooling fan replacement and maintenance, the generator cooling air overtemperature events stopped appearing. On 6 January 2026 Kavaken confirmed that the anomaly had disappeared from the signals. The client rated Kavaken's role as helpful.

    The stop records also show generator bearing flushing in September 2025. That was separate work and not part of the fix for this issue.

    Production
    50 MWh
    Financial
    USD 11,000
    CO2
    30 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    A summer rise in generator cooling air temperature can be the weather or a cooling fan losing performance. Checking the fan when the trend first appears can come before SCADA starts stopping or limiting the turbine.

    Next caseLow-risk gearbox bearing flag, gearbox replaced within about a monthRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.