Kavaken flagged a turbine whose gearbox oil inlet pressure had jumped on 29 September 2026, from 4.6% to 31.8% above its expected value, and stayed there. On the flag date it was 41.0% above expected and 93.8% above comparable turbines on the same farm. Kavaken asked whether a setpoint change or a part replacement explained the step, and recommended oil circuit checks. The next day the site team planned a gearbox high-speed shaft (HSS) replacement. On 5 October the turbine stopped three times on low oil inlet pressure. The replacement was carried out from 13 to 15 October, and the bearing ring that came out was heavily spalled.
High pressure first, low-pressure stops after
The same signal pointed in two directions within a week.
The deviation was measured against the turbine's own model and against comparable turbines. Over the 14 days before the flag, power output rose by 22.5% while generator speed stayed stable, nacelle air temperature fell by 20.8% and ambient temperature fell by 38.5%. The pressure was above what those conditions predicted.

34 days, step by step
SignalKavakenSite team
- Day −4 · 29 Sep 2026 · Signal
Oil inlet pressure steps up and holds
The deviation of gearbox oil inlet pressure versus its expected value rose from an average of 4.6% to 31.8%. Versus comparable turbines it rose from 3.5% to 31.1%. The new level was maintained.
- Day 0 · 3 Oct 2026 · Kavaken
Kavaken flags overpressure in the oil circuit
On the flag date the pressure was 41.0% above expected and 93.8% above comparable turbines. Kavaken recommended inspecting the oil filter for blockage and metallic particles, verifying the pressure with a calibrated gauge and testing the pressure regulating valve and the circulation pump line.
Flag log, Kavaken (translated): Please check whether this sudden change is due to a known wind farm-related cause, such as a parameter/setpoint revision or equipment replacement.
- Day 1 · 4 Oct 2026 · Site team
Site team plans an HSS replacement
The site team set the gearbox high-speed shaft replacement for the week of 12 October.
Flag log, site team (translated): The gearbox HSS replacement will be done in the week of 12 October.
- Day 2 · 5 Oct 2026 · Signal
Three stops on low oil inlet pressure
The turbine stopped three times on low gearbox oil inlet pressure, for 39, 28 and 9 minutes. Together the stops lasted 1.3 hours and cost 178 kWh.

Figure 2. Three stops on low gearbox oil inlet pressure on 5 October 2026: 39, 28 and 9 minutes, 1.3 hours and 178 kWh in total. - Day 10 to 12 · 13 Oct – 15 Oct 2026 · Site team · Fix
Gearbox high-speed shaft replaced
The site team carried out the HSS replacement over three days. The inner bearing ring removed in the work shows heavy spalling across its raceway.
Flag log, site team (translated): The HSS replacement started on 13.10.2026. The work was completed on 15.10.2026.

Figure 3. The inner bearing ring removed during the high-speed shaft replacement, with heavy spalling across the raceway. - Day 19 · 22 Oct 2026 · Site team
Site team reports the work complete
The site team confirmed the replacement as completed.
Flag log, site team (translated): HSS replacement completed.
- Day 33 · 5 Nov 2026 · Kavaken
Kavaken asks for dates and bearing photos
Kavaken asked the site team for the replacement date and for photos of the bearings.
- Day 34 · 6 Nov 2026 · Site team
Photos shared and the flag resolved
The site team shared photos of the removed bearing ring and of the assembly after the work. The flag was resolved.
Flag log, site team (translated): The state after the work was completed was shared.
The outcome
The site team completed the gearbox high-speed shaft replacement on 15 October 2026 and documented it with photos: the spalled inner bearing ring that was removed, and the rollers and cage in the housing after the work. The flag was resolved on 6 November 2026.
Kavaken's analysis had pointed to the pressure regulating valve in the oil inlet circuit as the most likely cause. The work carried out was the HSS replacement. How the bearing damage relates to the pressure step was not established.
The client rated Kavaken's role in the resolution as key.

- Production
- 520 MWh
- Financial
- USD 34,500
- CO2
- 330 t
Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.
Takeaway
When a pressure signal steps up and holds the new level, ask the same week whether a setpoint or a part changed. If nothing did, treat it as a hardware finding and plan the inspection before the turbine starts stopping on it.