Customer stories / Main shaft bearing / Failure risk

    A main bearing heat flag that pointed the site to an oil leak

    The main shaft bearing ran 8.8% above its expected range and 14.7% above similar turbines on the site, and no SCADA warning on the bearing followed until November. Four days after the flag, the site team found an oil leak and relubricated the bearing. The divergence continued, and the main bearing was replaced.

    Wind630MWhavoided-loss potential
    +8.8%
    above the expected range at the flag
    +14.7%
    above similar turbines on the site
    4 days
    from the flag to the oil leak finding
    185.2 h
    longest SCADA high-temperature warning

    Kavaken flagged the main shaft bearing of a wind turbine when its temperature ran 8.8% above the expected range and 14.7% above the average of similar turbines on the site. The divergence had started in late July and was progressing quickly. The first SCADA high-temperature warning on this bearing came in November 2025. Four days after the flag was raised, the site team found an oil leak at the main bearing. They relubricated it, took an oil sample and planned a borescope inspection. The temperature divergence continued in the following months. The client closed the flag on 31 August 2026 and reported that the main bearing had been replaced.

    Line chart of main shaft bearing temperature with a shaded expected band and red anomaly markers from the flag to August 2026, next to a scatter plot of bearing temperature against nacelle air temperature.
    Figure 1. Main shaft bearing temperature (rotor end) against its expected band from 45 days before the flag. Anomaly points cluster from the flag through August 2026, and none are marked after that.

    376 days, step by step

    KavakenSite teamSignal

    1. Day 0 · 20 Aug 2025 · Kavaken

      Kavaken flags main bearing heat

      Kavaken's models detected anomalous heat behaviour in the main shaft bearing. The flag was raised on 21 August 2025. The bearing temperature was 8.8% above its expected range and 14.7% above the average of similar turbines on the site. The deviation was consistent and on a rapidly rising trend.

      Flag log, Kavaken (translated): The main bearing temperature indicator is running 8.8% above the expected range and 14.7% above the average of similar turbines at the site. The divergence from the expected range and from the other turbines began towards the end of July and progressed quickly.

    2. Day 5 · 25 Aug 2025 · Site team · Fix

      Oil leak found, bearing relubricated

      The site team found an oil leak at the main bearing and relubricated it. They took an oil sample and planned a borescope inspection.

      Flag log, site team (translated): Oil leak detected. Lubrication done. Oil sample taken. Borescope planned.

    3. Day 36 · 25 Sep 2025 · Kavaken

      Anomaly progresses, flag risk raised

      The anomaly calculated by the sensor models for the rotor bearing temperature signal DTR RotBearTemp 1 kept progressing. Kavaken raised the flag to risk level 2. On 30 October 2025 the divergence from the other turbines on the site was still present.

    4. Day 90 · 18 Nov 2025 · Signal

      First SCADA high-temperature warning

      SCADA raised its first DTR RotBearTemp 1 high-temperature warning on the bearing, lasting 38.1 hours. A second warning followed on 23 November 2025 and lasted 10.4 hours. Neither stopped the turbine.

      Table of SCADA warning events with dates, event names, durations and zero losses, from November 2025 to June 2026, with summary boxes showing 0 min stop time and 6 min limitation time.
      Figure 2. SCADA events of the flag, November 2025 to June 2026: high-temperature warnings on the bearing and low-level warnings on the rotor bearing container, all with 0 kWh loss.
    5. Day 141 · 8 Jan 2026 · Site team

      Check planned at scheduled maintenance

      On 7 January 2026 Kavaken noted that the divergence was continuing and asked for a status update. The next day the site team replied that the bearing would be checked during the Type-3 maintenance.

      Flag log, site team (translated): A check will be made during the Type-3 maintenance. Estimated date of the maintenance work: January 2026 – February 2026.

    6. Day 230 · 7 Apr 2026 · Signal

      Bearing container low-level warnings begin

      SCADA raised low-level warnings on the rotor bearing container on 7, 8 and 10 April 2026. On 6 May 2026 the same warning started again and lasted 135.4 hours.

    7. Day 321 · 7 Jul 2026 · Kavaken

      Kavaken asks about flushing or replacement

      The divergence and the anomaly were still present. In June and early July 2026, SCADA raised seven high-temperature warnings on the bearing. Kavaken asked whether a flushing or a replacement was being planned.

      Flag log, Kavaken (translated): The divergence and the anomaly continue. If a flushing or a replacement is planned, we ask for the details to be entered.

    8. Day 344 · 30 Jul 2026 · Signal

      Longest warning and a short limitation

      A DTR RotBearTemp 1 high-temperature warning started and lasted 185.2 hours, the longest of the flag. It triggered a 6-minute power limitation with an estimated loss of 5.8 kWh. Further warnings followed on 8 August (115.0 hours) and 16 August 2026.

      Table of SCADA events from late July to late August 2026 listing bearing high-temperature warnings, one power limitation of 6 minutes with about 6 kWh loss, and container low-level warnings.
      Figure 3. SCADA events of the flag, July to August 2026, including the 185.2-hour high-temperature warning and the 6-minute power limitation of about 6 kWh.
    9. Day 376 · 31 Aug 2026 · Site team

      Main bearing replaced, flag resolved

      The client reported that the main bearing had been replaced, and the flag was resolved.

      Flag log, site team (translated): The main bearing has been replaced.

    Why it stayed hidden

    +8.8%
    above the expected range at the flag
    18 Nov 2025
    first SCADA high-temperature warning on the bearing
    0 min
    stop time across all related SCADA events

    At the flag, the bearing temperature was moderately above its expected range, with a consistent deviation. The first SCADA high-temperature warning on the bearing came three months later. None of the warnings that followed stopped the turbine. The only production effect was a 6-minute power limitation in July 2026, with an estimated loss of 5.8 kWh. The deviation showed in the comparison with the expected range and with similar turbines on the site, not in alarms that forced action.

    The outcome

    The client reported on 31 August 2026 that the main bearing had been replaced, and the flag was resolved.

    The relubrication in August 2025 did not end the anomaly. Kavaken recorded continued divergence from the site turbines in October 2025, January 2026 and July 2026. SCADA high-temperature warnings on the bearing recurred from November 2025 to August 2026. Low-level warnings on the rotor bearing container appeared in April, May and August 2026. In the product chart, no anomaly points are marked on the bearing temperature after August 2026.

    The client rated Kavaken's role as helpful.

    Production
    630 MWh
    Financial
    USD 47,600
    CO2
    390 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    A main bearing that drifts away from its expected range and from similar turbines is worth a physical check before any alarm, and here it led straight to an oil leak. When relubrication does not bring the temperature back, keep tracking the divergence and plan the larger work.

    Next caseThree lubrication measures, then a main bearing replacementRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.