On 11 August 2026 Kavaken flagged that high generator temperature stops were happening too often on a client's wind turbine. Each stop did its job and protected the generator, so no single event forced action. On 29 August Kavaken also flagged the generator bearing temperature: 14.4% above its expected value and 18.6% above similar turbines, with a rise that did not follow the nacelle temperature, the outside temperature or the load. The site added oil on 7 September and repaired a broken fan cable on 11 September. The flag was resolved on 21 September 2026.
41 days, step by step
KavakenSite team
- Day 0 · 11 Aug 2026 · Kavaken
Generator overheating stops flagged as too frequent
Kavaken flagged that high generator temperature stops were happening too often on the turbine. The risk was rated moderate.
- Day 18 · 29 Aug 2026 · Kavaken
Generator bearing temperature flagged as high risk
A second Kavaken flag on the same turbine: the generator bearing temperature ran 14.4% above its expected value and 18.6% above similar turbines. The rise did not follow the nacelle temperature, the outside temperature or the load.

Figure 1. Generator non-drive-end bearing temperature against its expected band, with the predictive maintenance flag at the end of August. Readings above the band cluster around the flag, and a few appear again in October and November. - Day 27 · 7 Sep 2026 · Site team · Fix 1 of 2
Oil added
The site team added oil.
Flag log, site team (translated): Oil was added on 7 September.
- Day 30 · 10 Sep 2026 · Kavaken
Grid and VCS high-temperature errors noted
Kavaken noted that "High temp grid" and "high temp VCS system" errors had been coming in recently, with high stops and losses.
Flag log, Kavaken (translated): Recently, "High temp grid" and "high temp VCS system" errors have been coming in. Stops and losses are high.
- Day 31 · 11 Sep 2026 · Site team · Fix 2 of 2
Broken fan cable repaired
The site team found a broken fan cable and repaired it.
Flag log, site team (translated): On 11 September the broken fan cable was repaired.
- Day 41 · 21 Sep 2026 · Kavaken
Flag resolved
The outages flag was resolved ten days after the fan cable repair.
Why it stayed hidden
Every high generator temperature stop was the protection doing its job, and the turbine came back afterwards. The problem was the frequency of the stops, not any single one. The bearing temperature rise did not follow the nacelle temperature, the outside temperature or the load, so warm weather or high output did not explain it. That pointed to the turbine itself.
The outcome
Two interventions were made four days apart: oil was added on 7 September and a broken fan cable was repaired on 11 September 2026. The outages flag was resolved on 21 September 2026.
The client rated Kavaken's role as helpful.
The generator bearing temperature chart still shows a few readings above the expected band in October and November 2026.
- Production
- 109 MWh
- Financial
- USD 7,009
- CO2
- 68 t
Takeaway
When a turbine trips on high temperature again and again, count the trips, not just the alarms. If the temperature rise does not follow load or weather, check the cooling path, down to the fan wiring.