Customer stories / Generator cooling system / Unusual outage

    A broken fan cable behind frequent generator overheating stops

    A wind turbine kept stopping on high generator temperature. Each stop was a protective trip on its own, so the pattern only stood out by how often it came. Oil was added, then the site team repaired a broken fan cable.

    Wind109MWhrealized impact
    +14.4%
    bearing temperature above expected
    +18.6%
    above similar turbines
    2
    interventions on site
    41 days
    from flag to resolution

    On 11 August 2026 Kavaken flagged that high generator temperature stops were happening too often on a client's wind turbine. Each stop did its job and protected the generator, so no single event forced action. On 29 August Kavaken also flagged the generator bearing temperature: 14.4% above its expected value and 18.6% above similar turbines, with a rise that did not follow the nacelle temperature, the outside temperature or the load. The site added oil on 7 September and repaired a broken fan cable on 11 September. The flag was resolved on 21 September 2026.

    41 days, step by step

    KavakenSite team

    1. Day 0 · 11 Aug 2026 · Kavaken

      Generator overheating stops flagged as too frequent

      Kavaken flagged that high generator temperature stops were happening too often on the turbine. The risk was rated moderate.

    2. Day 18 · 29 Aug 2026 · Kavaken

      Generator bearing temperature flagged as high risk

      A second Kavaken flag on the same turbine: the generator bearing temperature ran 14.4% above its expected value and 18.6% above similar turbines. The rise did not follow the nacelle temperature, the outside temperature or the load.

      Line chart of generator non-drive-end bearing temperature with a shaded expected band from mid July to late November 2026, red points above the band and a dashed flag line near 1 September, next to a scatter plot of temperature against wind speed.
      Figure 1. Generator non-drive-end bearing temperature against its expected band, with the predictive maintenance flag at the end of August. Readings above the band cluster around the flag, and a few appear again in October and November.
    3. Day 27 · 7 Sep 2026 · Site team · Fix 1 of 2

      Oil added

      The site team added oil.

      Flag log, site team (translated): Oil was added on 7 September.

    4. Day 30 · 10 Sep 2026 · Kavaken

      Grid and VCS high-temperature errors noted

      Kavaken noted that "High temp grid" and "high temp VCS system" errors had been coming in recently, with high stops and losses.

      Flag log, Kavaken (translated): Recently, "High temp grid" and "high temp VCS system" errors have been coming in. Stops and losses are high.

    5. Day 31 · 11 Sep 2026 · Site team · Fix 2 of 2

      Broken fan cable repaired

      The site team found a broken fan cable and repaired it.

      Flag log, site team (translated): On 11 September the broken fan cable was repaired.

    6. Day 41 · 21 Sep 2026 · Kavaken

      Flag resolved

      The outages flag was resolved ten days after the fan cable repair.

    Why it stayed hidden

    Each stop
    a normal protective trip
    No link
    to nacelle or outside temperature, or load

    Every high generator temperature stop was the protection doing its job, and the turbine came back afterwards. The problem was the frequency of the stops, not any single one. The bearing temperature rise did not follow the nacelle temperature, the outside temperature or the load, so warm weather or high output did not explain it. That pointed to the turbine itself.

    The outcome

    Two interventions were made four days apart: oil was added on 7 September and a broken fan cable was repaired on 11 September 2026. The outages flag was resolved on 21 September 2026.

    The client rated Kavaken's role as helpful.

    The generator bearing temperature chart still shows a few readings above the expected band in October and November 2026.

    Production
    109 MWh
    Financial
    USD 7,009
    CO2
    68 t

    Takeaway

    When a turbine trips on high temperature again and again, count the trips, not just the alarms. If the temperature rise does not follow load or weather, check the cooling path, down to the fan wiring.

    Next caseA clean borescope, then the bypass valve named in the first flagRead the case →
    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.