Customer stories / Generator bearing (NDE) / Failure risk

    No SCADA warning, but the NDE bearing ran 15.5% above its expected range

    A generator non-drive-end bearing ran hotter than expected and hotter than similar turbines on the same farm. SCADA raised no warning because the temperatures were within its normal levels. A bearing flushing by the OEM brought positive effects in the signals.

    Wind160MWhavoided-loss potential
    +15.5%
    above expected range
    +23.5%
    above similar turbines
    0
    SCADA warnings
    146 days
    flag to resolution

    On 18 September 2025, Kavaken flagged the generator non-drive-end bearing temperature of a wind turbine. It was running 15.5% above its expected range and 23.5% above the average of similar turbines in the wind farm. The deviation was steady, and the trend was upward. Nothing forced action: SCADA gave no warning, and by SCADA the temperatures were normal. After the flag, a visit to the turbine showed that the bearing needed flushing. The OEM carried out the flushing on 10 February 2026, and the positive effects showed in the signals the next day.

    What similar cases pointed to

    In similar cases on the same turbine type, the most common procedure was to clean the lubrication channels of the bearings, the chimneys and the waste oil reservoir.

    Kavaken recommended two actions: check the automatic lubrication mechanism and maintain it if needed, and flush the bearing. Flushing was the work that resolved the case.

    146 days, step by step

    KavakenSite teamOEM

    1. Day 0 · 18 Sep 2025 · Kavaken

      Kavaken flags overheating in the generator NDE bearing.

      The generator non-drive-end bearing temperature was 15.5% above its expected range and 23.5% above the average of similar turbines in the wind farm. The deviation was consistent, and the trend was upward. Kavaken recommended a check of the automatic lubrication mechanism and a bearing flushing.

    2. Day 77 · 4 Dec 2025 · Site team

      The site team asks the OEM to inspect.

      The client opened the investigation and passed the flag to the OEM for inspection.

      Flag log, site team (translated): The OEM was informed so that it could inspect the issue.

    3. Day 145 · 10 Feb 2026 · OEM · Fix

      The OEM flushes the bearing.

      After the Kavaken flag, a visit to the turbine showed that flushing was needed. The OEM carried out the flushing and completed its checks.

      Flag log, site team (translated): Flushing was carried out by the OEM, and the checks were completed.

    4. Day 146 · 11 Feb 2026 · Site team

      The signals show the effect, and the flag is resolved.

      The day after the flushing, the site team saw the positive effects of the intervention in the signals and resolved the flag.

      Flag log, site team (translated): The positive effects of the intervention were seen in the signals.

    Why it stayed hidden

    0
    SCADA warnings
    Normal
    temperature by SCADA limits
    +23.5%
    versus similar turbines

    SCADA raised no warning, and by SCADA the bearing temperatures were at normal levels. The deviation only stood out against the bearing's expected range and against similar turbines in the same wind farm. A steady, rising deviation that stays inside the alarm limits does not trigger an alarm. According to the client, the turbine visit that found the need for flushing was made because of the Kavaken flag.

    The outcome

    The OEM flushed the bearing on 10 February 2026 and completed its checks. The next day, the site team saw the positive effects of the intervention in the signals and resolved the flag.

    In the months after the flushing, the chart shows the bearing temperature moving inside its expected band, without the readings that were marked above it in late 2025.

    The client rated Kavaken's role as helpful.

    Two charts. Left: generator non-drive-end bearing temperature over time, with a flag line in September 2025 and red points between about 70 and 85 °C late in 2025. Right: bearing temperature against generator speed.
    Figure 1. Generator non-drive-end bearing temperature from 45 days before the flag to October 2026. Readings above the expected band are marked in red in late 2025. On the right, temperature is plotted against generator speed.
    Production
    160 MWh
    Financial
    USD 10,500
    CO2
    100 t

    Avoided-loss potential: Kavaken's estimate of the loss that the early finding prevented. It is not a realized saving.

    Takeaway

    A bearing temperature that is within SCADA limits can still be well above where it should run. Compare it with an expected range and with similar turbines on the same farm, and check lubrication before the limit is reached.

    Kavaken

    Autonomous Asset Performance Managementfor Renewable Energy

    Monthly updates from Kavaken. Unsubscribe anytime.

    United Kingdom

    Kavaken Limited

    TUSPark Eagle Labs
    27 Grainger Street
    Newcastle, NE1 5JE

    United States

    Kavaken, Inc.

    2500 Yale St Ste B
    Houston, TX 77008

    Türkiye

    Kavaken Yazılım A.Ş.

    Resitpasa Mah. Katar Cad.
    ITU ARI 8, 2/11
    Istanbul, 34467

    Member of:
    ORE CatapultNOFGWECTÜREBAmerican Clean Power
    Find us at:
    LinkedInYouTube

    © 2026 Kavaken. All rights reserved.